801-771-0933   (F) 801-355-0585

SolarWall Projects

Project 3

Repair HVAC with SolarWall – Bldg. 1A

Hill AFB, Utah

E-Corp began this5-month design-build project in March 2011 and finished in July 2011. E-Corp installed approximately 1,750 SF of single-stage SolarWall systems on the southeast exterior wall of the building and tied this system into two AHUs in the mechanical room. Work included penetrating the exterior wall in 4 air intake locations and ducting the heated air into the building where a damper and a DDC control system were installed to control the solar-heated air between the two air handling units. During the summer months, the system is equipped with the ability to vent the heated air to the outside, leaving the inside of the building cool for the workers. g.

SolarWall® Size: 1,700 SF
Impacted Bldg. Area: 340,000 SF
Bldg. Type: Warehouse
Project Cost: $112,349.00